Through a unique combination of engineering, construction and design disciplines and expertise.

Highway Design and Urban (re)Development Studies

Design of interurban and urban roads, level and uneven junctions, signage – road safety, design of pedestrian corridors – traffic calming zones – cycle paths, sidewalk configurations – pedestrian and cycle crossings.

Related Projects

  • Final Internal Main Road Network Design (20km in length – 2 lanes per direction with a central reservation), which includes:
    • Poseidonos Ave. Tunnel (Cut & Cover) of 1.10 km length (3 lanes per direction).
    • Cut & Cover Underpass of 0.35 km length (2 lanes per direction).
    • Flyover (0.40 km long) of the existing Poseidonos Ave. (1 lane per direction with central reservation).
    • 2 Grade Separated Junctions (one four-legged and one three-legged) at the two edges of the Poseidonos Ave. Tunnel.
    • 11 Roundabouts (2 traffic lanes).
    • 5 Signalized Junctions.
    • 32 Priority Junctions.
  • Final Internal Local Road Network Design (45 km in length), which includes:
    • Two or one-way local roads designed as shared streets with on-street parking).
    • 51 Priority Junctions, at intersections between shared streets.
  • Final Tramway Study.
  • Final Design of 40km Cycle Routes.
  • Final Pedestrian Corridors’ Study.
  • Final Horizontal and Vertical Signage – Road Safety Study, for road segments and junctions with a total length of 65 km.
  • Traffic Signal Programs for:
    • 5 junctions and 75 pedestrian crossings.
    • 6 intersections of the road network with the Tram.
  • Bill of Quantities, Budgets and Tender Documents.
  • Traffic Arrangements during Construction Period.

Road Network Design of Metropolitan Pole of Hellinikon – Ag. Kosmasdenco-transport-odiko-diktyo-mitropolitikou-polou-ellinikou-ag-kosma

Poseidonos Avenue Tunnel (1.1 km long)

siraga-leof-poseidonos-mikous-1.1xml

Redevelopment of urban collector roads, formation of traffic calming zones and construction of cycle paths in the implementation framework of the SUMP (2016-2022)

Transformation of El. Venizelou St. in Larissa to a Shared Traffic Road (Peds, Cycle Route, Bus Only Lane)

anaplasi-odou-el-venizelou-larisa

Redevelopment of Ipirou St. (Collector Road)

anaplasi-sillektirias-odou-ipeirou

Configuration of Asklipiou St. in a Traffic Calming Corridor

diamorfosi-odou-asklipiou-se-ipias-kikloforias

Configuration of Pindou – Dervenakion Junction

diamorfosi-komvoy-pindou-dervenakion

Configuration of Pentelis St. in a Traffic Calming Corridor

diamorfosi-odou-pentelis-se-ipias-kikloforias

Final study and construction design of the internal road network and car parking areas for the post-Olympic use of the CANOE-KAGIAK facilities. Signage study of the parking areas (1,444 car spaces, 500 two-wheelers, 42 buses) and internal road network. Informative guidance signage on the wider road network (2006-2007)

Master plan of the CANOE-KAYAK SLALOM Olympic facilities transformation study to a major Theme - Sports and Aquatic Park

diamorfosi-olimpiakis-egatastasis-kanoe-kagiak-slalom

(Subproject 004) of the “National Highway Athens – Lamia, Kifissos Ave., Section 0+000km to 0+700km” project (2009-2010)