Through a unique combination of engineering, construction and design disciplines and expertise.
Highway Design and Urban (re)Development Studies
Design of interurban and urban roads, level and uneven junctions, signage – road safety, design of pedestrian corridors – traffic calming zones – cycle paths, sidewalk configurations – pedestrian and cycle crossings.
Related Projects
- Final Internal Main Road Network Design (20km in length – 2 lanes per direction with a central reservation), which includes:
- Poseidonos Ave. Tunnel (Cut & Cover) of 1.10 km length (3 lanes per direction).
- Cut & Cover Underpass of 0.35 km length (2 lanes per direction).
- Flyover (0.40 km long) of the existing Poseidonos Ave. (1 lane per direction with central reservation).
- 2 Grade Separated Junctions (one four-legged and one three-legged) at the two edges of the Poseidonos Ave. Tunnel.
- 11 Roundabouts (2 traffic lanes).
- 5 Signalized Junctions.
- 32 Priority Junctions.
- Final Internal Local Road Network Design (45 km in length), which includes:
- Two or one-way local roads designed as shared streets with on-street parking).
- 51 Priority Junctions, at intersections between shared streets.
- Final Tramway Study.
- Final Design of 40km Cycle Routes.
- Final Pedestrian Corridors’ Study.
- Final Horizontal and Vertical Signage – Road Safety Study, for road segments and junctions with a total length of 65 km.
- Traffic Signal Programs for:
- 5 junctions and 75 pedestrian crossings.
- 6 intersections of the road network with the Tram.
- Bill of Quantities, Budgets and Tender Documents.
- Traffic Arrangements during Construction Period.
Road Network Design of Metropolitan Pole of Hellinikon – Ag. Kosmas
Poseidonos Avenue Tunnel (1.1 km long)
Roads’ Redevelopment in the Area of Ag. Thomas, Maroussi
Redevelopment of Kountouriotou – El. Venizelou Streets in Heraklion, Attica
Redevelopment of urban collector roads, formation of traffic calming zones and construction of cycle paths in the implementation framework of the SUMP (2016-2022)
Transformation of El. Venizelou St. in Larissa to a Shared Traffic Road (Peds, Cycle Route, Bus Only Lane)
Redevelopment of Ipirou St. (Collector Road)
Configuration of Asklipiou St. in a Traffic Calming Corridor
New Barka City στο ΟΜΑΝ
Configuration of Pindou – Dervenakion Junction
Configuration of Pentelis St. in a Traffic Calming Corridor
New National Opera and National Library of Greece, Athens Faliron Delta
Final study and construction design of the internal road network and car parking areas for the post-Olympic use of the CANOE-KAGIAK facilities. Signage study of the parking areas (1,444 car spaces, 500 two-wheelers, 42 buses) and internal road network. Informative guidance signage on the wider road network (2006-2007)
Master plan of the CANOE-KAYAK SLALOM Olympic facilities transformation study to a major Theme - Sports and Aquatic Park
Mediterranean Cosmos
Traffic and Access Study – Parking Study of the Olympic Athletic Complex of Athens (OAKA) Adjacent Area
Olympic Press Village and Multi-purpose Centre in Maroussi, Attica
Viologikos I/C- Nicosia Ring Road
Egnatia Highway Connections Peristera I/C & Redestou I/C
Node Configuration at Kourtessi
(Subproject 004) of the “National Highway Athens – Lamia, Kifissos Ave., Section 0+000km to 0+700km” project (2009-2010)
Kifissou Ave. Proposed Traffic Arrangements – Acharnon I/C Area