Master plan for the Metropolitan Site of Hellinikon. Overview of regional transportation network- Internal road network design for the new development - Public Transportation - Parking requirements estimation, proposed locations and capacities - Preliminary Traffic Impact Study and traffic assignment estimation on the internal network (2013-2014)

01-34-hellinikon

Master plan for the Metropolitan Site of Hellinikon

 

Traffic impact study, preliminary car park design, access - internal road network final and construction design, for the new building of the Greek National Opera and the National Library of Greece at the Athens Faliron Delta (SNFCC) (2009 -2012)

02-35opera

New National Opera and new National Library of Greece, at the Athens Faliron Delta

 

Traffic Management Study for the town centre, in the Municipality of Rhodes - Island of Rhodes (2012-2013)

03-rodos

Traffic Management Study for the town center in the Municipality of Rhodes

 

Traffic Management Study for the Municipality of Nafpaktos(2012-2014)

04-nafpaktos                                     Traffic Management Study for the Municipality of Nafpaktos

 

Trans Adriatic Pipeline (TAP). Traffic Impact Study

05-tapTAP - Trans Adriatic Pipeline

 

Traffic Management study for the municipality of Ierapetra (2008 – 2009).

06-ierapetra

Traffic Management Study for the municipality of Ierapetra

Traffic Management Study for the Municipality of Tavros, Attiki (2008 – 2009).

07-tavros

Traffic Management Study for the municipality of Tavros

 

 Master plan of Zakynthos Island Port. Traffic Impact Study, Traffic Management Study for the Port and the main access road network. (2013).

08-zakynthos

            Traffic Management Study for the Port and the main access road network – Zakynthos Island Port

 

Post-Olympic use for CANOE-KAYAK SLALOM installations as a major Theme - Sports and Aquatic Park. Design of internal road network - parking facilities, Traffic Impact Study. (2006 -2007)

09-40-canoe

Master plan of Post-Olympic use for Canoe Kayak Slalom installations, as a major

Theme – Sports andAquaticPark.

 

Technical Consulting Services to the Organizing Committee, for the strategic planning, design and operation of the Olympic Transportation System and the implementation of various traffic management measures, for the Athens 2004 Olympic Games (2002 – 2004).

10-oaka

Estimated trafficvolumesatOAKAadjacentroadnetwork, during the Olympic events

 

Traffic ManagementStudy for the  Municipality of Pyrgos, Peloponnese (2007 – 2008).

Traffic Management study for the municipality of Kos (2006- 2007)

Traffic and Parking study for the Municipality of Acharnes (2004 – 2006).

Traffic Management study for the municipality of Pefki(2002 – 2005)

Study for traffic deviations during the construction of the extension of Athens Metro Line 2 towards Anthoupoli and the completion of three stations of Line 3. (2006 – 2007).

11-metro12-metro

       BusTrafficDeviationAnthoupoli                                    Peristeri Station

LINE 2 – ATHENS METRO

 

Road realignment study and traffic deviations, during the construction of the extension of Line 3 ( Attiko Metro) from Chaidari to Piraeus.(2012 – today)

13-metro

                                             Traffic deviations around Agia Varvara Metro Station, during the extension works of Line 3.

 

 

DuringtheMetroStationconstructionforAthensMetroLines 2 and 3: traffic deviation studies,signagestudies, signalizationstudiesduringtheconstruction, rehabilitationstudiesafterthecompletionofworks, implementationsupervision, as built drawings, traffic surveys at signalized junctions after the implementation of the works  (1994-1999).

14-metro15-metro

Traffic Deviation Mesogeion Avenue                     Traffic Deviation Vas. Sofias Avenue

Athens Metro Construction

 

Comprehensive Transportation Study for the Thessaloniki greater urban area (1997 – 1999).

16-thessaloniki

Comprehensive transportation study. Thessaloniki

 

Comprehensive Transportation Study for the city of Larissa, Greece  (1990 –1992)

17-larissa

Pedestrianisation of city center, Larissa.